This unprecedented modernisation and reconfiguration programme represents works worth €84.2 million excl. VAT and covers constructing a new main building, re-using the existing building stock (45,000 m2) and developing a new above-ground car park with five hundred spaces.

Work will commence in 2022 and end in 2025.

PROJECT TECHNICAL SHEET :

Programme: Construction and refurbishment of the Meaux Saint-Faron hospital site

Project Owner: GHEF (Grand Hôpital de l’Est Francilien) – Meaux University Hospital

Land area: 12.4 ha
Overall project area: 45,000 m²
Cost of works: €84,270,000 excl. VAT, value April 2020
Competition: winner June 2020
Delivery: December 2025

Project Management:

AIA Architectes: lead architect
AIA Ingénierie Structure (new), Energy and fluids HVAC (new and restructuring), Electricity (new and restructuring), Economics.
TPF Ingénierie: Roads and utilities/external layouts/law on water, Structure (restructuring), Demolitions/asbestos removal, Summary (option), Acoustics, Information Systems Security Correspondent (CSSI).
AIA Environnement: Environmental quality, HQE – sustainable development.
AIA Territoires: Landscaper, town planner
AIA Management: SCMC
Perspectives © C.Wallon

Client
GHEF (Grand Hôpital de l’Est Francilien) – CH Meaux

Main Contractors
AIA Architectes : architecte mandataire AIA Ingénierie : Structure (neuf), CVC énergie & fluides (neuf et restructuration), Electricité (neuf et restructuration), Economie. TPF Ingénierie : VRD / aménagements extérieurs / loi sur l’eau, Structure (restructuration), Démolition / désamiantage, Synthèse (option), Acoustique, CSSI. AIA Environnement : Qualité environnementale, HQE – développement durable. AIA Territoires : Paysagiste, urbaniste AIA Management : OPC

Surface(s)
12,4 ha, 45 763 m² dont 12 800 m² réhabilités

Cost
84 270 000 € HT, valeur avril 2020

Timeline
Concours: lauréat Juin 2020 Livraison : Décembre 2025

Partager le projet