Reconstruction of 227 nursing home beds and places on the Parrot site
The reconstruction of the EHPAD on the Parrot site of the Périgueux Hospital Center will take place on an occupied site, showcasing the full potential of the existing facilities. This project blends memory and modernity by introducing new uses while respecting the spirit of the place. It aims to redefine the site’s main structural axes through the strategic placement of built volumes, leveraging the site’s notable elements while accounting for the phasing constraints inherent to occupied-site construction.
Adopting a forward-thinking approach to the “nursing home of tomorrow,” the project promotes openness to the city, intergenerational interaction, and a home-like model that breaks away from traditional institutional codes.
Phase 1 : Start and Initial Construction
Breakdown : Permanent and temporary accommodation: 120 beds, including 2 emergency temporary stays
Phase 2 is outside the scope of operations
Phase 3 : Finalization and Additional Construction
Client
Périgueux Hospital Center, Lead Institution of the Dordogne GHT (Territorial Hospital Group)
Project Management Assistance
A2MO Bordeaux
Lead Architect
AIA Life Designers
Full Technical Engineering
AIA Ingénierie
Environmental Expertise
AIA Environnement
Program
Construction and modernization of EHPAD facilities on the Parrot site of Périgueux Hospital Center (227 beds and places)
Surfaces
New construction : Estimated demolition: 12,230 m² // Target construction : 8,402 m² (Phase 1 : 4,969 m² / Phase 3 : 3,433 m²) // Total floor area : Target construction : 12,019 m² // Third place / community space : 140 m²
Total Construction Cost
€28 million (excl. tax)
Delivery Timeline
Phase 1 : 2027 / Phase 3 : 2030